Skip to Content

 

Welcome to TienGiang Portal.

Slideshow Image 1 Slideshow Image 1 Slideshow Image 1 Slideshow Image 1

Web link Web link

List of projects calling for investment in 2015-2016 of Tien Giang province List of projects calling for investment in 2015-2016 of Tien Giang province

Investment for Exploitation of Ong Van Ferry Terminal

PROJECT 19:

1. Project name:

Investment for Exploitation of Ong Van Ferry Terminal

2. Project's objectives:

The construction of a ferry terminal with larger size and transport load to replace the existing ferry terminal is one of the objectives of interest; to contribute to facilitating for the needs of travel, transport of commodities and agricultural products to be served.

3. Investment form:

Wholly domestic or foreign owned

4. Project scale:            

Area: residential land is 71.39 m2, serving pedestrians and motorcycles only

Total estimated investment capital: 2.4 billion dongs

Capacity/output/description:

+ To the North of Co Co River: (Wharf surface width of 5 m; Wharf length of 19.55 m)

- 25-cm thick reinforced concrete main wharf

- Wharf piles, piers and end

- River bank reinforcement in a range of 10 m

- Waiting shelter (2x4m)

+ To the South of Co Co River: (Wharf surface width: 5 m; Wharf length: 19.55 m)

- 25-cm thick reinforced concrete main terminal

- Wharf piles, piers and end

- River bank reinforcement in a range of 10 m

- Waiting shelter (2x4m)

5. Grounds to build the project:     

The existing wooden ferry terminal is severely deteriorated, the entire wooden wharf is damaged, and floorboards are slippery, causing the traffic and transport of passengers to be unsafe. So, it is very necessary to upgrade the ferry terminal.

6. Project location:

- Location: My Luong Commune, Cai Be District

7. Infrastructure at project location            

- Land: currently state-managed

- Status of the terminal: two wooden wharfs are deteriorated, main means of transport are wooden ferries, and safety level during transport is low.

- Terrain:

+ The areas where the ferry terminals are situated are relatively largely sloping riverbanks, average altitude between riverbank and access road surface is + 1.5m, the river is10-12 m deep

+ The main status is narrow roads covered by rubble, concrete. The existing wooden wharf is damaged in many spots, making it difficult and dangerous to travel.

8. Investment incentives conditions

- Investment conditions: under the conditions stipulated in the Land Law No. 45/2013/QH13 dated November 29th, 2013

9. Social effects of the project:

Limiting internal waterway traffic accidents happening in seasons of strong waves and high winds, while contributing to the local socio-economic development.

10. Agencies providing project information

People's committee of Cai Be district
Address: Vo Chi Cong street, Quarter I, Cai Be town
Contact: Mr Nguyen Van Nha
Position: Vice chairman
Phone: 0913879118


Others
Sewer and wastewater treatment systems in My Tho City    14/03/2016
Tan Ly Dong Industrial Complex    13/03/2016
Cho Gao Industrial Complex    13/03/2016
Binh Dong Industrial Zone    13/03/2016
Binh Dong Commune resettlement areas    13/03/2016
Bao Dinh ecological residential area    13/03/2016
Residential area along both sides of extended Nguyen Trai Street    13/03/2016
Vam Lang Residential Area    13/03/2016
Thoi Son Island Resort - Ecotourism Zone    13/03/2016
Tan Thanh - Hang Duong marine ecotourism area    13/03/2016

Video Video

Go to All